West 2nd Street

Medford, OR - 2012

Description

For their second FORTA-FI® project, the City of Medford placed 640 tons down to repair an old cracked concrete roadway, West 2nd Street. This was a challenging project because the existing roadway disintegrated under the milling machine so the foundation to lay the new pavement down was very rough. The FORTA-FI® went down without a hitch. 

Key Points

  • Extended Pavement Life
  • Reduced Rutting & Raveling
  • Reduced Cracking 

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =