Description
For their second FORTA-FI® project, the City of Medford placed 640 tons down to repair an old cracked concrete roadway, West 2nd Street. This was a challenging project because the existing roadway disintegrated under the milling machine so the foundation to lay the new pavement down was very rough. The FORTA-FI® went down without a hitch.
Key Points
- Extended Pavement Life
- Reduced Rutting & Raveling
- Reduced Cracking