Description

Penn DOT 5-0 chose SR61 for their FORTA-FI® pilot project in 2014. The northbound stretch between Mountain Road and SR895 was paved using fibers. The southbound lane had no fibers. This pavement was selected because it is a distressed concrete section which has been treated with a microsurfacing application. Ideally, the pavement should be replaced, but until funding is available 5-0 is essentially looking for a better Band-Aid. A 1 1/2” leveling course was placed followed by a 1 1/2” wearing course using PG76-22. 

Key Words

  • Extended Pavement Life
  • Reduced Rutting & Cracking
  • Cost Savings

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =