I-80 Vedauwoo Section

Cheyenne, WY - 2014

Description

WYDOT had planned a 5” mill and fill along five miles of I-80 between Laramie and Cheyenne. In the Eastbound travel lane an existing longitudinal crack ran the length of the project. FORTA-FI® was added to the lower 2.5” lift of asphalt base course to slow the propagation of this crack to the surface. In addition, the enhanced stiffness of the fiber-reinforced asphalt will provide greater resistance to fatigue, extending the life of the pavement.

Key Points

  • Extended Pavement Life
  • Reduced Rutting & Raveling
  • Reduced Cracking

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =