Dorsey Avenue

Morgantown, WV - 2016

Project Description

The city of Morgantown, WV incorporated a trial section containing FORTA-FI® in both lanes on Dorsey Avenue. The project also contains a control section with no fiber in order to accurately compare the success of the overlay with fiber. Dorsey Avenue has high truck traffi c and the goal of the project is to evaluate FORTAFI®’s ability to reduce reflective cracking under heavy traffic loads. The project is going to be closely monitored and updates will come in the future.

Key Points

  • Extended Pavement Life
  • Reduced Rutting & Raveling
  • Reduced Cracking

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =