Auburn Hills, MI - September 2018

Project Description

The Department of Public Works (DPW), located in Auburn Hills, Mi, chose to reinforce the asphalt in their new parking lot project using FORTA-FI high tensile fibers. This project consisted of
repaving the DPW parking lot and the area around the fuel pumps. For this trial, they used a total of 3,000 tons of asphalt and 400 of the tons were fiber reinforced asphalt. This project design was a mill and fill with a finished thickness of 1½ inches. By reinforcing this parking lot with FORTA-FI, the DPW will increase the durability; therefore, extending the life of this project and reducing future maintenance costs. Ultimately, the DPW will see a higher reduction in cracking and raveling over the control section of this trial.

Key Points

  • Increased Life
  • Reduced Raveling
  • Reduced Cracking

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =