Vinarice, Czech Republic - October 2010

Project Description:

FORTA-FI® was used in a 7 cm (2.75") base and a 4 cm (1.5") wearng course on a steep, high volume, heavy truck access road. On the edge of a new residential project right next to the asphalt plant asphalt mix is placed on compacted subgrade. The streed is rather steep, leading from the plant exit straight down. The street will be exposed to heavy loads of full tracks transporting asphalt mixes from the plant.

Project Participants

PROJECT NAME:Vinarice, Czech Republic
LOCATION:Vinarice, Czech Republic
PROJECT DATE: October 2010
PROJECT OWNER: City of Vinarice
SPECIFIER:Group North, Sever, Bohemia Asphalt
ASPHALT PRODUCER: Bohemia Asphalt
FORTA-FI TYPE/LENGTH:FORTA-FI, HMA Blend 3/4" (19mm) long, #(FIHMA190.5KM)
FIBER DOSAGE: 0.5 kg/tonne
ASPHALT TONNAGE: 300 tons

Project Photos:

  • Vinarice, Czech Republic
  • Vinarice, Czech Republic
  • Vinarice, Czech Republic
  • Vinarice, Czech Republic

Street Talk with Tracy Lang

The Street Talk video series is comprised of 14 short videos discussing FORTA-FI Fiber Reinforcement Technology for Asphalt. The two- to three-minute videos will answer frequently asked questions, talk about the benefits and highlight key asphalt projects using FORTA-FI.

Watch the Videos  |  Sign Up for Updates

Calculate Your Savings!

FORTA-FI your asphalt for Tons of Savings! Compare material costs between a traditional asphalt mix and FORTAfied Asphalt.OPEN SAVINGS CALCULATOR
Go Stronger... Go Longer... Get FORTAfied!®
Close Calculator
Calculate Your Savings!
Select Unit: US Ton Metric Ton

Enter Asphalt:


Enter Asphalt Price:

FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =