Project Description:

In late 1988 FORTA AR® was specified and utilized to minimize deformation of the surface-course of a heavily trafficked toll-booth area for the Massachusetts Turnpike Commission. The three-dimensional fiber reinforcement was used in over 500 tons of Massachusetts Type F High Stability Bituminous Concrete, at a dosage of 1.0 lb. per ton. The project was located at Toll-Booth #11A, between mile 0 and mile 4 in West Stockbridge, MA.

Project Participants

Owner: Massachusetts Turnpike Commission West Stockbridge, MA
Specifier: Howard, Needles, Tammen & Bergendoff, Boston, MA
Contractor: Lane Construction Corp., Pittsfield, MA
Fiber: FORTA AR 1-1/2" long
Fiber Dosage: 1.0 lb./ton

 

Street Talk with Tracy Lang

The Street Talk video series is comprised of 14 short videos discussing FORTA-FI Fiber Reinforcement Technology for Asphalt. The two- to three-minute videos will answer frequently asked questions, talk about the benefits and highlight key asphalt projects using FORTA-FI.

Watch the Videos  |  Sign Up for Updates

Calculate Your Savings!

FORTA-FI your asphalt for Tons of Savings! Compare material costs between a traditional asphalt mix and FORTAfied Asphalt.OPEN SAVINGS CALCULATOR

Get FORTAfied!

Apply for our FREE TRIAL offer! Free FORTA-FI asphalt-reinforcing fibers to manage your worst asphalt nightmare!CLICK HERE FOR DETAILS
Go Stronger... Go Longer... Get FORTAfied!®
Close Calculator
Calculate Your Savings!
Select Unit: US Ton Metric Ton

Enter Asphalt:


Enter Asphalt Price:

FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =